Parking Lot Paving Stone Mountain Chic Fil A

Chic-Fil-A Stone Mountain Parking Lot Repaving & Restriping This project consisted of profile milling and a complete Permaflex overlay.  All concrete curbs, pads and asphalt abutments were profile milled to allow the new asphalt overlay to be compacted to flush with all curbs and concrete pads. The milling was performed on a Saturday night after closing and completed prior to our paving team arriving on Sunday morning. This project consisted of over 2,700 square yards of Permaflex overlay, replacement of 11 concrete wheel stops to more modern black & yellow rubber wheel stops and a complete restriping of all parking lines and stencils to the original configuration. Total project duration from start to finish…11:00 pm Saturday night until 6:00 pm Sunday...

Asphalt Repair With Concrete

    Did you know that RP Paving now offers concrete services? RP was asked to demo a 250 square foot area of damaged asphalt and pour back 8” of 4000 psi steel reinforced concrete in front of the properties trash dumpsters. The property owner also wanted the concrete to match the existing asphalt. We elected to use liquid integral black color and the result was a match. Another job well...

Parking Lot Paving Suwanee Ga

Bountiful Care Suwanee, GA This was a ground up project of approx 3,200 square yards to include a DOT deceleration lane as well. All parking lot paving was installed during 3 separate phases at 6″ base, 2 ” binder and 1″ of topping. The scope of work also entailed aggregate fire lane access drives installed around the perimeter of the...

Ammersee Lakes HOA Street Repaving

This street paving job consisted of approximately 12,000 sy of full depth cement reclamation and over 14,000 sy of profile milling with Permaflex overlay throughout the entire community.  In depth planning and coordination was the key factor in minimizing disruption to over 165 home owners. Despite several days of inclement weather, this project was completed on time, with minimal disruption and in accordance with the engineering specifications. Excavating and preparing road for new asphalt New subgrade prepared using the Full Depth Reclamation Process Newly paved street Subgrade being treated with portland...

Decatur Ga Wendy’s Parking Lot Repaving Project

  Wendys Parking Lot Project In Decatur Ga   This was a time sensitive project in that the store closed for only 1 day. It consisted of edge milling all curbs, pads and abutments, along with a complete 2,600 square yard Permaflex overlay. All striping was completed at the end of the work day and the restaurant was open for business the next...

Olde Mill Shopping Center Parking Lot Repaving Job

  Olde Mill Shopping Center Marietta Ga   This project consisted of over 20,000 square yards of Permaflex(pictures show are of the Permaflex layer)overlay combined with edge milling around all islands, curbs and abutments. The milling portion of this project was completed in one 12 hour over night shift to minimize disruption. The paving portion of this project was divided into 5 consecutive days of paving in order to cause minimal disruption to the centers tenants and customers. All restriping and stenciling of each newly paved area was completed at the end of each work day and open for traffic the next...

Parking Lot Repair Vs Repaving, How To Decide

Should I Repair Or Repave My Parking Lot? Few things are worse than watching customers drive through your business’s parking lot, bounce off pot holes and trip over cracks in the asphalt. And if there’s standing water? Also not good. However, even though your parking lot is showing its age, it doesn’t necessarily need you to repave the entire thing. When you’re trying to decide whether to focus on parking lot repair or parking lot repaving, first you need to understand the reasons why it breaks down over time. The Integrity of Asphalt There are a few major factors that will affect the integrity of your asphalt. If you’re in a more extreme northern climate, the constant freeze-thaw cycle causes the asphalt to expand and contract, eventually causing damage. If your business hosts a bunch of heavy vehicles – including semis – you’re likely to see the street and parking lot degrade at an accelerated rate. Finally, the condition of the subgrade also has an impact on your parking lot. Parking Lot Repair First thing’s first – regardless of whether or not you choose to resurface your parking lot, you will need to repair it. Failing to make repairs at this stage will result in problems down the line – as the same issues will continue to crop up again. However, resurfacing may not be necessary. So how do you decide? Basically, you should focus on parking lot repair if the signs of damage are superficial. This includes cracks less than a quarter-inch wide, smaller pot holes, and cracks that form a straight line. Parking Lot Repaving Generally, your...

The Best Testimonial Ever!!

With permission of the customer we wanted to share a recent email we received. We are not perfect but we do try our best to perform the best job possible Large or Small. Please see the following glowing review from Mr. Greg Cerny of United Umbrella Services, LLC written to our very own Chris Carter, VP of Asphalt Sales: Chris, It is exceedingly rare that I ever give a written review to a sub-contractor!  EVER!!!   However, in this instance, you need to know how I feel about you, your staff and the efforts that were made to take care of our issues out at Douglas Pavilion. 1. Your willingness to accommodate our immediate needs was beyond “top drawer”.  A HUGE THANK YOU!!! 2. The staff that responded did so with not only in a very professional manner, all three did so like a finely oiled “team” with the most impressive timing I’ve EVER experienced in 35 plus years in commercial property maintenance!      a.  The young man jumped into the hole and cleared all the soggy mud!      b.  Then he and his helper, the older gent, measured off and spray painted the hole at 12” compacting increments and they began filling the hole and compacting every 12”.   Then they measured off the saw cut and painted that as well.      c.   Just as they completed that, the truck driver showed up as if orchestrated with the crush and run and he dumped it and headed back out for the asphalt and the two others started to compact it into the remaining space 4” below grade.    ...

Pin It on Pinterest

SEO by seo my business